The former Slotervaart Hospital is currently being transformed so that the building from the 1970s will be completely future-proof after the renovation. On behalf of MedicomZes, we are providing the steel for the roof addition, which includes two extra floors and extends over the four wings of the building.
For the safe transport of materials to the working height of over 45 meters, we use a crash deck. The crash deck is designed to be easily moved between the different buildings.
45m
Working height
2
Execution class
Moving the crash deck to the next construction wing:
Direct contact? Call +31 229 240444