For our regular client M3 Ruimtebouwers B.V., we are providing the steel structure for the new Osprey Terminal in Amsterdam.
The terminal, licensed for storage up to 150,000 tons of cocoa beans, is being constructed in such a way that six trucks can unload simultaneously, with a capacity to automatically fill halls up to 300 T per hour.
The building consists of 2 halls, each measuring 313 by 58 meters, with a span of 58 meters using 2 grid girders with butt joints. Together with the two-story office building, this gives a total area of 38,720 m².
1500
Tons of steel
38.720
m2 area
Direct contact? Call +31 229 240444